Typical Parts & Applications

We support a wide range of automotive parts that are closely tied to product development, fit checks, validation testing, and early production.

Stamped sheet-metal EV battery pack lower tray with reinforcing ribs and mounting holes
Formed steel brake dust shield with ventilation slots and integrated caliper bracket

Stamped sheet-metal lower tray with reinforcing ribs and mounting holes, typical EV battery pack housing or underbody floor panel

Formed steel brake dust shield with ventilation slots and integrated caliper bracket, protects the brake disc from road debris

Sheet-metal battery module top cover with louvered vents and mounting points
Thin formed sheet-metal cover plate with rectangular cutout for EV battery sensor window

Flat sheet-metal cover with louvered openings and mounting points, used as a battery module or electronic control unit top cover.

Thin formed panel with a central rectangular cutout, serves as a mounting/cover plate for display screens, harness routing, or sensor windows in EV battery assemblies.

Industry Challenges

Six pressures sit on every automotive program right now. Each one shows up in our quote requests. Each one changes what your supplier has to do, not just promise.

Shorter Development Cycles 

EV programs that ran on a 48-month cycle in 2018 now ship in 18–24 months. By the time a body engineer locks a CAD revision, sheet metal samples are due on the bench in 10 working days, not 6 weeks. Prototype suppliers either keep that pace or get cut.

More Complex Parts and Assemblies

A single ADAS bracket can carry a milled aluminum mounting face (±0.05 mm), a molded sensor housing (PC/ABS, Class A finish), an EMI-shielded cable channel, and a heat-staked nameplate. Four processes, one part number, one PPAP file. Coordination failures usually show up as gaps at first assembly trial, not on the drawing.

Tight Tolerance and Repeatability Requirements

Bearing seats hold ±0.012 mm. Sealing faces hold flatness within 0.02 mm. Powertrain bolt patterns sit on true-position callouts of Ø0.1. Full tolerance standards we work to are listed in our Tolerances & Standards page. Across a 50,000-part run, Cpk has to stay above 1.33, anything below triggers a containment action and a deviation request to the OEM.

Higher Quality Documentation Demands

A production part submission for Ford, GM, or Stellantis means a full PPAP Level 3 package: design records, DFMEA, PFMEA, control plan, MSA study, capability study, AAR, and ISIR. Submit incomplete and the program slides a week per round of rework. We build the file alongside the first article, not after sign-off.

Supply Chain Pressure

Aluminum 6061-T6 plate runs 4–6 weeks lead time today. A multi-cavity steel mold runs 8–12 weeks. A program change at week 16, a redesigned harness routing, a relocated mounting boss, can wipe both. Our bridge path: machine from billet during mold rework, ship parts off the prototype line while the production tool gets revised.

Lightweighting and Material Performance

A 10% weight reduction adds 6–8% range to a BEV. That math drives the swap from steel to aluminum (30–60% mass savings) and the push into magnesium AZ91D for seat frames and steering brackets (up to 70% savings, but coating required for corrosion). Glass-filled PA66 replaces metal on intake manifolds and pedal boxes. Each material swap changes the process: aluminum needs different feeds and tooling than steel, magnesium needs inert atmosphere on the mill, GF-PA66 wears out unhardened mold steel.

Recommended Capabilities

5-axis CNC machining of aluminum 6061-T6 automotive bracket to ±0.05 mm tolerance

CNC Machining

Steel multi-cavity mold for glass-filled PA66 automotive intake and pedal components

Rapid Injection Molding

Silicone vacuum casting for automotive interior trim and sensor housing prototypes

Vacuum Casting

Laser cutting and forming sheet metal for EV battery trays and brake shields

Sheet Metal Fabrication

3D-printed ADAS bracket and fixture prototypes for automotive fit-check validation

Additive Manufacturing

Anodized and powder-coated automotive parts after PPAP-level surface finishing inspection

Surface Finishing

Automotive Common Materials

Aluminum 6061-T6


The default stock for most automotive CNC work. ADAS brackets, sensor mounting faces, thermal management housings, EV battery covers. Yield strength 276 MPa in T6 condition, runs clean on 5-axis milling, welds without cracking, takes Type II and Type III anodizing. RoHS and REACH compliant, so IMDS submission is straightforward. Raw plate runs 4 to 6 weeks on the open market. We carry stock to cover mid-program design changes without resetting lead time.
Full material specs on our CNC Machining page

Full material specs on our CNC Machining page

Aluminum 7075-T6

Tensile strength up to 570 MPa. Goes into suspension links, steering knuckles, high-performance EV chassis members, and motorsport subframes where 6061 is too soft. About two-thirds the weight of structural steel at comparable load ratings. Not weldable. Joints go mechanical: rivets, bolts, press fits. Exposed to salt spray or brake fluid, it needs hard-coat anodizing or electroless nickel before going on the car. More expensive than 6061 and machines slower, so quote quantities carefully.

Full grade comparison on our Materials and Properties page

Magnesium AZ91D

Density 1.81 g/cm³, lighter than aluminum by 35%. Shows up on seat frames, steering column brackets, instrument panel carriers, and transfer case housings where every gram counts on BEV range targets. AZ91D carries 9% aluminum and 1% zinc, better castability and corrosion resistance than AZ31B. Machining runs under inert atmosphere to control chip ignition risk. Bare magnesium corrodes fast, so every part gets chemical conversion coating or e-coat before leaving. That finishing step is quoted and scheduled alongside the machining, not added later.

Full material specs on our Materials and Properties page

Glass-Filled PA66 (GF-PA66)

Intake manifolds, pedal boxes, fan blades, wiring harness brackets. At 30% glass fill, tensile strength reaches around 180 MPa and continuous service temperature holds to 130°C. Far more dimensionally stable than unfilled PA66 across humidity cycles. The glass fiber tears up unhardened mold steel. H13 or P20 hardened tooling is the minimum, not optional. Higher glass content also shifts the shrinkage differential between flow and cross-flow directions, so gate location gets locked in at DFM review, not after T1 sampling.

Process details on our Rapid Injection Molding page

Cold-Rolled Steel 1018 / 1045

Brake dust shields, sheet metal mounting plates, body reinforcements, grounding brackets. 1018 bends and stamps without cracking, 1045 runs harder for wear-contact parts. Both work as bridge stock when production tooling is in revision: we machine from billet while the revised mold is being cut, same drawing revision, same inspection plan. Bare steel rusts. Parts going to phosphate-and-paint or e-coat need scale and mill oxide removed first.

Process details on our Sheet Metal Fabrication page

Stainless Steel 304 / 316

Exhaust flanges, sensor housings, liquid cooling line fittings, EV battery thermal management connectors. 304 covers most underhood applications. 316 adds molybdenum, which cuts pitting and crevice corrosion in parts that see road salt, brake fluid, or coolant long-term. Harder to cut than aluminum. Running conservative surface footage is cheaper than burning through inserts early. Both grades carry full mill certs and lot traceability for PPAP and IMDS submission.

Process details on our CNC Machining page

How Quality Gets Built — Not Inspected In

A failed weld on a seat bracket triggers a TS-16949 8D within 48 hours. A bad bushing dimension on a steering column stops a paint-line. We run to IATF 16949:2016, AIAG PPAP 4th Edition, and the customer-specific requirements (CSRs) each OEM publishes Ford, GM, Stellantis, Toyota, Honda all have current revisions on file.

Quality Systems and Documentation

Every program runs on APQP phases 1–5. PPAP package built in parallel with the first article: PSW, DFMEA/PFMEA, control plan, MSA, initial capability study, AAR, IMDS submission. Submission level (1–5) confirmed at quote. Level 3 is the assumption unless the buyer specifies otherwise

Inspection Flow

First-piece inspection before the run starts. In-process gauging on CTQ features every 30 minutes or every 25 parts, whichever comes first. SPC chart tracking on critical dimensions, with auto-stop if any point crosses ±3σ. Final lot sample to ANSI/ASQ Z1.4 Level II before release.

Risk Control

DFMEA at design freeze. PFMEA at process sign-off. Both get a recurrence × severity × detection score; anything over RPN 100 gets a documented mitigation action before tooling release. On the supply side: dual-sourced material for any commodity with a single-source lead time over 6 weeks. Change-point control on tooling, raw material lot, and operator, logged, signed, and shared on request.

Automotive Manufacturing FAQ

Q1: What PPAP level do you submit by default, and how long does it take?


Level 3 by default. That’s the full 18-element package per AIAG PPAP 4th Edition: design records, DFMEA/PFMEA, control plan, MSA study, CMM-measured dimensional results, initial Cpk study, AAR, IMDS submission, signed PSW. If your customer specifies Level 1 or 2 in writing, we match that.
Timeline from program kick-off to signed PSW: 15 to 18 weeks for a new safety-critical CNC part. Weeks 1 to 3 cover planning, contract review, FMEA kick-off. Weeks 4 to 8 are process design, fixture concept, tooling design, DFM feedback. Weeks 9 to 12 are tooling fabrication, first-article machining, initial dimensional verification. Weeks 13 to 15 run Gage R&R, initial Ppk. Weeks 16 to 18 are package assembly, submission, Q&A, PSW signature. The PPAP file gets built alongside first-article production, not assembled after sign-off. We send a draft to your SQE for pre-review at week 14 so the formal submission at week 16 doesn’t stall. Re-submissions after an ECN or parts with an existing approved process run faster.

Q2: Is there a minimum order quantity on automotive prototypes?


No MOQ on CNC-machined prototypes. Single-piece runs get quoted and accepted. Bridge injection tooling runs 50 to 500 pieces and scales to short-run production of 500 to 5,000 per tool. Sheet metal has no minimum on formed and stamped parts.
Unit cost on 1 to 10 pieces reflects setup and programming time. That same cost amortizes fast across a 25 to 50-piece repeat order on the same program and fixtures. Send us your target quantity and we’ll show you the per-piece curve.

Q3: What automotive materials do you stock, and which lightweighting alloys can you run?


Standard stock: aluminum 6061-T6 and 7075-T6, cold-rolled steel 1018 and 1045, stainless 304 and 316, mild steel for sheet metal.
For lightweighting programs, we machine magnesium AZ91D under inert-atmosphere milling conditions to control chip ignition risk, and we run glass-filled PA66 (GF-PA66) in H13 hardened-steel molds rated for the abrasive wear. Both show up regularly on EV seat frames, steering brackets, intake manifolds, and pedal boxes. The mass-reduction math is real: 30 to 70% versus steel depending on alloy.
All material lots arrive with mill test reports and get tagged by heat number through the work order and onto the part or shipping container at final inspection. Full lot-to-heat traceability for IMDS submission and OEM audit requests.

Q4: Can you handle a multi-process part across machining, molding, and sheet metal under one PPAP?


Yes. One PPAP package can cover a multi-process assembly: a milled aluminum mounting face at ±0.05 mm, a molded PC/ABS sensor housing, a stamped sheet metal bracket, all submitted under one PSW with a unified control plan. Each sub-process has its own PFMEA and process flow, consolidated at the package level.
ADAS brackets, EV thermal management enclosures, and body-in-white assemblies all land here. Coordination failures on multi-process parts show up at first assembly trial, not on the drawing. We run DFM reviews across all processes at quote stage to catch clearance stacks, GD&T datum conflicts, and weld distortion affecting machined datum faces before any tooling gets cut.

Q5: Do you sign NDAs, and how is CAD data handled inside the facility?


We sign mutual NDAs before any drawing or model is shared. CAD files and 2D prints go into a controlled document system. Only the specific operation-level drawings needed for each production step get released to the floor. No customer geometry, part photos, or production videos get shared externally or posted on any public platform. That applies to prototype work and production orders equally.
For programs where the assembly function or vehicle application is sensitive, ask for our standard mutual NDA at quote stage. It covers drawing data, process information, and production volumes.

Q6: My EV program compressed to an 18 to 24-month cycle. Can you keep up with prototype-to-production-tooling timelines that tight?


The path: CNC prototype samples ship in 7 business days from approved STEP file. Bridge injection tooling with T1 samples in 3 to 4 weeks. Steel production tooling in 8 to 12 weeks.
If a design change at week 16 requires mold rework, we machine from billet off the prototype line while the production tool is revised. Same dimensions, same material, PPAP-compatible. Validation testing doesn’t stop.
EV programs running on 18-month schedules usually slip at two points: late first-article delivery and an incomplete PPAP at tooling release. Both are decisions, not capacity questions. We quote with both timelines visible so your program manager can plan around actual lead time, not a best-case number.